D.1: Monitoring the project contribution to the implementation of the Greek National Adaptation Strategy and other socioeconomic impact
D1.D1: Project impact monitoring protocol (M 24)
D1.D2: First assessment of the LIFE-IP AdaptInGR impact and contribution (M 24)
D1.D3: Second assessment of the LIFE-IP AdaptInGR impact and contribution (M 48)
D1.D4: Third assessment of the LIFE-IP AdaptInGR impact and contribution (M 72)
D1.D5: Final assessment of the LIFE-IP AdaptInGR impact and contribution (M 96)
D.2. Monitoring the impact of the project pilot actions
D2.D1: Protocol for monitoring the LIFE-IP AdaptInGR pilot actions’ impact (M 24)
D2.D2: First report of the LIFE-IP AdaptInGR pilot actions’ impact (M 24)
D2.D3: Second report of the LIFE-IP AdaptInGR pilot actions’ impact (M 48)
D2.D4: Third report of the LIFE-IP AdaptInGR pilot actions’ impact (M 72)
D2.D5: Final report of the LIFE-IP AdaptInGR pilot actions’ impact (M 96)